Your organization is on one plan. The plan sets limits, and Plan and usage in the organization’s settings shows each one beside how much of it you have used. Admins can see the page.

The page always shows how many runs you have started this period and when the period resets; on a plan with no monthly allowance it says so. Each other limit is shown only when your plan sets it. A limit your plan does not set does not apply to you.

Limit What it means At the limit
Runs this period How many runs your organization can start in a month. New runs and batches are refused until the period starts again.
Concurrent runs How many of your runs can be running at the same moment. More wait their turn. Nothing is refused.
Runs per hour How many runs can start in any hour. Live pages count too. More are refused until the hour has room.
Concurrent live pages How many live pages can be held open at once. Another cannot be opened until one closes.
Workflows How many workflows the organization has, across every project. Deleted ones, drafts, and routines don’t count. A new workflow is refused until one is deleted. A draft stays a draft until there is room.
Projects How many projects the organization has. Deleted ones don’t count. A new project is refused until one is deleted.
Steps per workflow The most steps one workflow can have. A step that runs a routine counts as one. A longer workflow still runs. It can be saved again once it is within the limit.

On every plan, a workflow can’t run more than 200 steps with its routines’ steps counted, and one with more is refused when it is saved.

Every run counts toward Runs this period, however it ends: passed, failed, or cancelled after it started. These do not count:

  • A run that Belay interrupted.
  • A run of unsaved steps started in the editor, and a run that was asked to stop after a chosen step.
  • A run cancelled while it was still queued, since it never started.
  • A live page. Writing and trying steps is free on every plan.

A batch counts one run for each workflow it starts. A workflow’s run is one run however many routines it runs, and a routine never runs on its own. A pipeline’s runs of workflows’ files count too, including a file that differs from its saved workflow: a pipeline testing a change is not writing steps.

The period is a month that begins on the day of the month your organization was created, at 00:00 UTC. In a month too short to have that day, it begins on the month’s last day. The page shows when the current period began and when the next one starts.

Belay can add extra runs to an organization whose plan has a monthly allowance. They are added to the month’s total, so Runs this period counts against the plan’s runs and the extra runs together, and a line under it says how many extra runs are included and until when.

Extra runs last until the end of the period they were added in. They do not carry over to the next one.

Being at or over a limit only refuses the next start or addition. It never deletes anything, switches anything off, or stops a run that is already going.

If your organization is moved to a smaller plan while it has more than that plan allows, everything you have stays: every workflow still opens, saves, and runs. Only new additions are refused until you are within the limit.

A refused start says which limit it met, in words, and for runs, when they can start again. For example:

This month’s 200 runs are used; runs start again on 12 December 2026 (2026-12-12T00:00:00Z). No run was queued.

A batch starts whole or not at all, so its message says how many runs it needs and how many are left.

A schedule whose batch is refused stays on and records the reason as Not started. See Schedules.

An agent gets the same message as the error of the tool it called.